|
| image = 中山公园.jpg | image_width = 265px | image_alt = | caption = Platform of Zhongshan Park | type = Rapid transit | system = Wuhan Metro | status = Operational | locale = Wuhan, China | start = Jinyintan | end = Optics Valley Square | stations = 21 | routes = 1 | ridership = 383,600 (2013 Avg.)〔 799,913 (May 2014 Peak)〔(【引用サイトリンク】 title=129万人次挤地铁 )〕 | open = December 28, 2012.〔(【引用サイトリンク】 title=Subway ticket price hearing held )〕 | close = | owner = Wuhan | operator = Wuhan Metro Group Co., Ltd. | character = Underground | depot = | stock = Chinese Type B | linelength = | tracklength = | notrack = 2 | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} |} The Line 2 of Wuhan Metro () is the first underground metro line crossing the Yangtze River. This line has started trial run on September 25, 2012,〔(【引用サイトリンク】 title=Subway line NO.2 takes 48 minutes for one trip )〕〔(【引用サイトリンク】 title=Wuhan Metro Line 2 starts trial run, first cross-Yangtze subway in the country. )〕 and has opened on December 28, 2012.〔〔(1st subway across Yangtze River starts test run )〕〔(Chinese) (年底确保地铁2号线开通 ) Jan. 31, 2012〕 It is Wuhan's second metro line after Line 1, and the city's first underground line, since Line 1 is mostly elevated. Line 2 runs in a northwest-southeast direction, connecting Hankou and Wuchang, including Hankou Railway Station and major commercial districts. The number of single day passengers on Line 2 has exceeded 500,000 on Jan 1, 2013, the first weekday after its opening, excluding elders holding free passes.〔(【引用サイトリンク】 title=武汉地铁2号线开通首个全工作日,客流量突破50万人次 )〕 When more lines interchangeable with Line 2 open around 2015, the passenger volume could reach 1 million per day. To accommodate such huge traffic, all stations on Line 2 have been extended to the length of 8-car trains for future use.〔(【引用サイトリンク】 title=武汉地铁2号线 范湖地铁站初现雏形(图文) )〕 Line 2 might be the most important metro line in the Wuhan Metro system for being able to carry the heavy cross-Yangtze traffic in Wuhan. ==Overview== *Length: 〔(【引用サイトリンク】 title=今日10时武汉地铁2号线开通 武汉迈入地铁时代(图) )〕 *Gauge: *Stations: 21. *Double track: full line. *Electrified: full line. *Underground: full line. *Traffic direction: right-hand side. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 2, Wuhan Metro」の詳細全文を読む スポンサード リンク
|